Area Projects-
North CBD Access Study (Gary Grunwald, PW)
|
|
Richards &
N.12th/N.16th Street Intersection project (Tim Mar, PW)
|
|
Sproule Avenue
Overlay (Rick Batha, PW)
|
|
|
|
•$140,000 should be able to pay for developing
street sections for the Gateway Area for all the streets (with a 30-40%
contingency). Can get an estimate for
cost per lineal foot of improvements and identify restraints.
|
|
•Area is part of the larger Richards
Redevelopment Area.
|
|
•East of N.12th Street is combined
system (sewer/storm water). West it is
separate.
|
|
•There is no water main on N. 16th
Street between Sproule and N. C St.
|